Riverfront Development Work at Nanded

Client: IL&FS Limited, New Delhi

Details:

Mathematical model studies using HEC-RAS model have been conducted to study the expected inundation in the Nanded town due to the flooding in the river Godavari after implementing the proposed interventions for the development of the River Front. The model has been set up using the Survey Points supplied by the client.

TIN (Triangular Irregular Network) model has been constructed using contours. The baseline condition has been simulated using the cross sections derived from the TIN model and also by incorporating the existing bridge in the study reach. The observed flood of August 2006 has been used to simulate the flooding and compute the inundatation under baseline condition.

A detailed inundation map has been produced with respect to the August 2006 flood.

Previous     Next

Website Designed by Raghwendra Web Solutions